Building area of lot has been cleared and ready for building. All stumps were removed and 149 loads of shale and dirt were hauled in to level building area. Driveway area was undercut 3' to create a stable base. Perc test completed and septic system for 5 bedroom plan designed and approved by Health Dept.
Loading...
Data Provided by ATTOM Data Solutions
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Data Provided by Walk Score®
Loading...
Data Provided by ATTOM Data Solutions
Loading...