Construction of this beautiful home is estimated to begin in October of 2023 with an estimated completion date of September of 2024. This home will feature vaulted cathedral ceilings in the great room and primary bedroom. The primary bedroom is located on first floor with his and hers walk in closets. There are two additional bedrooms with en-suites on the first floor. Just off the chef's kitchen there is a walk-in pantry with additional sink and loads of storage. There is a large two car garage with separate golf cart stall. The second floor has an additional bedroom and bathroom as well as a large media room with a wet bar.The buyer will have an opportunity to choose fixtures and finishes if purchased early in construction of the home.
913185
Residential - Single Family, 2 Story
4
4 Full/1 Half
2023
Walton
Public
2
Fiber cement
Public Sewer
Loading...
Data Provided by ATTOM Data Solutions
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Data Provided by Walk Score®
Loading...
Data Provided by ATTOM Data Solutions
Loading...