New construction. Expected completion date is 12/3/24. There will be a concrete driveway poured, grass will be sowed, light landscaping, LVP flooring, granite countertops. Split floorplan, One level living. Concrete back patio will be poured prior to closing.
4198316
Residential - Single Family, 1 Story
3
2 Full
2024
Yadkin
0.4
Acres
Public
1
Public Sewer
Loading...
Data Provided by ATTOM Data Solutions
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Data Provided by Walk Score®
Loading...
Data Provided by ATTOM Data Solutions
Loading...