New construction. Expected completion date is 12/3/24. There will be a concrete driveway poured, grass will be sowed, light landscaping, LVP flooring, granite countertops. Split floorplan, One level living. Concrete back patio will be poured prior to closing.
1162424
Residential - Single Family, Other
3
2 Full
2024
Yadkin
0.4
Acres
Public Water
Vinyl Siding
Public Sewer
Loading...
Data Provided by ATTOM Data Solutions
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Data Provided by Walk Score®
Loading...
Data Provided by ATTOM Data Solutions
Loading...