Pre-Construction. To be built. Brand new Maronda Homes St Sebastian Townhome with estimated completion date of August 2024. CBS construction with full builder warranties. Terrific plan featuring large great room, solid surface tops in kitchen, EVP flooring, refrigerator / washer / dryer, blinds and much, much more.
O6191592
Residential - Condo, Townhouse, Contemporary, 2 Story, Townhouse
3
2 Full/1 Half
2024
Pasco
0.05
Acres
Public
2
Block,Stucco
Public Sewer
Loading...
Data Provided by ATTOM Data Solutions
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Data Provided by Walk Score®
Loading...
Data Provided by ATTOM Data Solutions
Loading...