
Pre-Construction. To be built. Brand new Maronda Homes Livorno A4 plan with estimated completion date of April 2025. CBS construction with full builder warranties. Terrific plan featuring large great room, formal dining room, flex / media space, gourmet kitchen appliances, extensive ceramic tile flooring, lanai and much, much more.
O6201606
Residential - Single Family, Contemporary, 1 Story
4
3 Full
2024
Volusia
0.18
Acres
Private, Well
1
Block,Stucco
Septic Needed
Loading...
Data Provided by Data Labs®
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Data Provided by Walk Score®
Loading...
Data Provided by ATTOM Data®
Loading...