Pre-Construction. To be built. Brand new Maronda Homes Carlisle C3 plan with estimated completion date of October 2024. CBS constructionwith full builder warranties. Terrific plan featuring large great room, loft area, solid surface tops in kitchen, extensiveceramic tile flooring, refrigerator / washer / dryer, lanai and much, much more.
O6197311
Residential - Single Family, Contemporary, 2 Story
4
2 Full/1 Half
2024
Volusia
0.22
Acres
Public
2
Block,Stucco
Public Sewer
Loading...
Data Provided by ATTOM Data Solutions
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Data Provided by Walk Score®
Loading...
Data Provided by ATTOM Data Solutions
Loading...