Brand new Maronda Homes Miramar A4 plan with estimated completion date of November 2024. CBS construction with full builder warranties. Terrific planfeaturing stone accented front elevation, large great room, 9'4'' volume ceilings, solid surface tops in kitchen, extensive ceramic tile flooring, refrigerator, blinds, lanai andmuch, much more.
RX-10979818
Residential - Single Family, Contemporary, 1 Story
4
2 Full
2024
St. Lucie
1
Loading...
Data Provided by ATTOM Data Solutions
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Data Provided by Walk Score®
Loading...
Data Provided by ATTOM Data Solutions
Loading...