Under Construction. Brand new 4/2 spec home with estimated completion date July 2021. The Mirada community features a 15 acre lagoon for its residents plus many other features. CBS construction with full builder warranties. Terrific plan featuring large great room, 9'4" volume ceilings, 3 car garage, solid surface tops and upgraded cabinets in kitchen, SS appliances, extensive EVP flooring and much, much more.
O5924512
Residential - Single Family, Contemporary, 1 Story
4
2 Full
2021
Pasco
0.169881
Acres
1
Block,Stucco
Loading...
Data Provided by ATTOM Data Solutions
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Data Provided by Walk Score®
Loading...
Data Provided by ATTOM Data Solutions
Loading...