Pre-Construction. To be built. Brand new builder owned 4/2 spec home with estimated completion date of Sept 2024. CBS construction with fullbuilder warranties. Terrific plan featuring large great room, stone accented front elevation, solid surface tops in kitchen and much, much more
O6149287
Residential - Single Family, Contemporary, 1 Story
4
2 Full
2022
Lake
0.13
Acres
Public
1
Block,Stone,Stucco
Public Sewer
Loading...
Data Provided by ATTOM Data Solutions
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Data Provided by Walk Score®
Loading...
Data Provided by ATTOM Data Solutions
Loading...