A202 is the last remaining unit to be built in Revery Point! We have started construction and the estimated completion date is in May 2024. A202 offers 2 bedrooms and 3 full bathrooms with an additional flex room on the main floor. All of the main living is on the first floor with a second floor flex space, full bath, and guest bedroom, as well as attic storage space. Call today to secure this unit and become a resident of Revery Point in Foxland Harbor!
2628733
Residential - Condo, Townhouse, 2 Story, Townhouse
2
3 Full
2023
Sumner
Public
2
Brick,Stone
Public Sewer
Loading...
Data Provided by ATTOM Data Solutions
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Data Provided by Walk Score®
Loading...
Data Provided by ATTOM Data Solutions
Loading...